Our Services

Fleet List

fleet_list

​INTERTANKO CHARTERING QUESTIONNAIRE 88 - OIL/CHEMICAL Version 5 Created at Q88.com
1. GENERAL INFORMATION
1.1 Date updated: May 11, 2023
1.2 Vessel's name (IMO number): Bubyan (9656034)
1.3 Vessel's previous name(s) and date(s) of change: Not Applicable
1.4 Date delivered / Builder (where built): May 28, 2014 / Hyundai Mipo Dockyard
1.5 Flag / Port of Registry: Kuwait / Mina' al Ahmadi
1.6 Call sign / MMSI:
9KSU / 447017000
1.7 Vessel's contact details (satcom/fax/email etc.): Tel: 870773922315, 4723673376, 4723673377
Fax: 870783916247
Email: bbn@kotc.com.kw
1.8 Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): Oil Tanker
1.9 Type of hull: Double Hull
Ownership and Operation
1.10 Registered owner - Full style: Kuwait Oil Tanker Company S.A.K.
Shuwaikh Administrative Area - Block 4 Jamal Abdul Nasser Street. P.O.Box : 810 Safat 13009 Kuwait
Kuwait
Tel: +965 24625028 / 24625029
Fax: +965 2491 3597 / 2462 5025 / 2462 5026
Telex: 496 31142 / 496 31143 / 496 22013
Email: ho-email@kotc.com.kw
Web: www.kotc.com.kw
1.11 Technical operator - Full style: Same as registered owner
Kuwait
Tel: +965 24625028 / 24625029
Email: ho-email@kotc.com.kw
Company IMO#: 100261
1.12 Commercial operator - Full style: Kuwait Petroleum Corporation
P.O. Box 26565, Safat 13126 Kuwait
Kuwait
Tel: +965 2381 3787
Fax: +965 2491 2792
Telex: 44875
Email: marineops@kpc.com.kw
Web: www.kpc.com.kw
1.13 Disponent owner - Full style: SAME AS 1.44
Insurance
1.14 P & I Club - Full Style: United Kingdom Mutual Steam Ship Assurance Association Ltd
1.15 P & I Club pollution liability coverage / expiration date: 1,000,000,000 US$
1.16 Hull & Machinery insured by - Full Style:
(Specify broker or leading underwriter)
1.17 Hull & Machinery insured value / expiration date: US$
Classification
1.18 Classification society: Nippon Kaiji Kyokai
1.19 Class notation: NS* (CSR, Tanker, Oils-Flashpoint on and below 60 degrees C and Chemicals Type III, Performance Standard for Protective Coatings for Dedicated Seawater Ballast Tanks in All Types of Ships and Double-side Skin Spaces of Bulk Carriers)(Prime Ship-Fatigue Assessment, trading in the North Atlantic wave environment)(ESP)(IWS)(PSCM)(EA+STS,VOC)(IHM)(NVC-C)(MVA)(M0)
1.20 Is the vessel subject to any conditions of class, class extensions, outstanding memorandums or class recommendations? If yes, give details:
1.21 If classification society changed, name of previous and date of change: New Construction - Class Unknown, Not Applicable
1.22 Does the vessel have ice class? If yes, state what level: No, Not Applicable
1.23 Date / place of last dry-dock: Jun 17, 2019 / Dubai
1.24 Date next dry dock due / next annual survey due: May 27, 2024
1.25 Date of last special survey / next special survey due: Jun 17, 2019 May 27, 2024
1.26 If ship has Condition Assessment Program (CAP), what is the latest overall rating: No, (Not Applicable )
Dimensions
1.27 Length overall (LOA): 185.99 m
1.28 Length between perpendiculars (LBP): 176.96 m
1.29 Extreme breadth (Beam): 32.24 m
1.30 Moulded depth: 18.50 m
1.31 Keel to masthead (KTM)/ Keel to masthead (KTM) in collapsed condition, if applicable: 49.96 m m (Not applicable )
1.32 Distance bridge front to center of manifold: 56.06 m
1.33 Bow to center manifold (BCM) / Stern to center manifold (SCM): 91.70 m 94.40 m
1.34 Parallel body distances: Lightship Normal Ballast Summer Dwt
Forward to mid-point manifold: 44.65 m 47.64 m 47.64 m
Aft to mid-point manifold: 21.65 m 48.72 m 69.09 m
Parallel body length: 66.30 m 96.36 m 116.73 m
Tonnages
1.35 Net Tonnage: 12,436.00
1.36 Gross Tonnage / Reduced Gross Tonnage (if applicable): 31,445.00
1.37 Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): 32,702.31 28,168.55
1.38 Panama Canal Net Tonnage (PCNT): 26,081.00
Loadline Information
1.39 Loadline Freeboard Draft Deadweight Displacement
Summer: 6.14 m 12.37 m 46,320.00 MT 59,158.00 MT
Winter: 6.40 m 12.13 m 44,910.00 MT 57,738.00 MT
Tropical: 5.89 m 12.64 m 47,760.00 MT 60,588.00 MT
Lightship: 15.17 m 3.33 m   12,828 MT
Normal Ballast Condition: 11.03 m 7.47 m 20,348.80 MT 33,186.80 MT
Segregated Ballast Condition: 10.97 m 7.53 m 20,649.10 MT 33,487.00 MT
1.40 FWA/TPC at summer draft: 267.00 mm 55.24 MT
1.41 Does vessel have multiple SDWT? If yes, please provide all assigned loadlines: Yes
1.42 Constant (excluding fresh water): MT
1.43 What is the company guidelines for Under Keel Clearance (UKC) for this vessel?
1.44 What is the max height of mast above waterline (air draft) Full Mast Collapsed Mast
Summer deadweight: 37.59 m 0 m
Normal ballast: 41.60 m 0 m
Lightship: 46.63 m 0 m
 
2. CERTIFICATES Issued Last Annual Last Intermediate Expires
2.1 Safety Equipment Certificate (SEC): Jul 01, 2020 Jun 18, 2022 Jun 18, 2022 May 27, 2024
2.2 Safety Radio Certificate (SRC) Jul 01, 2020 Jun 18, 2022 Jun 18, 2022 May 27, 2024
2.3 Safety Construction Certificate (SCC): Nov 30, 2019 Feb 27, 2023 Feb 27, 2022 May 27, 2024
2.4 International Loadline Certificate (ILC): Jun 17, 2019 Feb 27, 2023 Feb 27, 2022 May 27, 2024
2.5 International Oil Pollution Prevention Certificate (IOPPC): Jan 27, 2020 Feb 27, 2023 Feb 27, 2022 May 27, 2024
2.6 International Ship Security Certificate (ISSC): Jul 24, 2019 Not Applicable Feb 07, 2022 Oct 15, 2024
2.7 Maritime Labour Certificate (MLC):  
2.8 ISM Safety Management Certificate (SMC): Sep 04, 2019 Not Applicable Feb 02, 2022 Nov 08, 2024
2.9 Document of Compliance (DOC): Dec 15, 2019 Mar 15, 2022 Jan 21, 2025
2.10 USCG Certificate of Compliance (USCGCOC): Not Applicable Not Applicable
2.11 Civil Liability Convention (CLC) 1992 Certificate: Feb 20, 2023     Feb 20, 2024
2.12 Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: Feb 20, 2023     Feb 20, 2024
2.13 Liability for the Removal of Wrecks Certificate (WRC): Feb 20, 2023     Feb 20, 2024
2.14 U.S. Certificate of Financial Responsibility (COFR): Not Applicable     Not Applicable
2.15 Certificate of Class (COC): May 28, 2014 Feb 27, 2023 Feb 27, 2022 May 27, 2024
2.16 International Sewage Pollution Prevention Certificate (ISPPC): May 28, 2014     Nov 28, 2014
2.17 Certificate of Fitness (COF): Jun 17, 2019 Feb 27, 2023 Feb 22, 2022 May 27, 2024
2.18 International Energy Efficiency Certificate (IEEC):      
2.19 International Air Pollution Prevention Certificate (IAPPC): May 28, 2014 Not Applicable Nov 28, 2014
Documentation
2.20 Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: Yes
2.21 Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? Yes
2.22 Is the ITF Special Agreement on board (if applicable)?
2.23 ITF Blue Card expiry date (if applicable):
 
3. CREW
3.1 Nationality of Master: Syrian
3.2 Number and nationality of Officers: 10 Egyptian, Indian, Polish, Syrian, Kuwaiti
3.3 Number and nationality of Crew: 15 Filipino
3.4 What is the common working language onboard:
3.5 Do officers speak and understand English: Yes
3.6 If Officers/Crew employed by a Manning Agency - Full style: Officers:
Liberty Manning Services Ltd.
Shuwaikh Administrative Area Block 4 Jamal Abdul Nasser Street Kuwait
Tel: +965 2462 5443
Fax: +965 2462 5492
Telex: 496 31142
Email: ho-email@kotc.com.kw

Crew:
NAESS Shipping, Philippines Inc.
Naess House, 2215 Leon Guinto Road, Malate Manila, Philippines
Tel: +63 2 5211592-95/2-5213376
Fax: +63 2 5210594/2 5258252
Telex: N/A
Email: mail@naess.com.ph
 
4. FOR USA CALLS
4.1 Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? No
4.2 Qualified individual (QI) - Full style:
Not Applicable
4.3 Oil Spill Response Organization (OSRO) - Full style:
Not Applicable
4.4 Salvage and Marine Firefighting Services (SMFF) - Full Style:
 
5. SAFETY/HELICOPTER
5.1 Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): Yes
Both
5.2 Can the ship comply with the ICS Helicopter Guidelines? Yes
5.2.1 If Yes, state whether winching or landing area provided: Winching
5.2.2 If Yes, what is the diameter of the circle provided: 5.00 m
 
6. COATING/ANODES
Tank Coating
6.1 Tank Coating Coated Type To What Extent Anodes
Cargo tanks: N/A Phenolic Epoxy Whole Tank No
Ballast tanks: Yes Epoxy Yes
Slop tanks: Yes Epoxy Whole Tank
 
7. BALLAST
7.1 Pumps: No. Type Capacity At What Head (sg=1.0)
Ballast Pumps: 2 MarFlex Deepwell Submerged Pump - MDPC - 300 (Submerged into 6(P) & 6(S) WBTs) 1,000 m3/hr 35 m
Ballast Eductors: 2 Venturi 140 m3/hr 35 m
 
8. CARGO-OIL/CHEMICAL
Double Hull Vessels
8.1 Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: Yes, Solid
Cargo Tank Capacities
8.2 Number of cargo tanks and total cubic capacity (98%): 103,785.50 m3
8.2.1 Capacity (98%) of each natural segregation with double valve (specify tanks): Seg#1: 5770.9 m3 (1)
Seg#2: 7668.3 m3 (2)
Seg#3: 7877.2 m3 (3)
Seg#4: 6534 m3 (4)
Seg#5: 7880.5 m3 (5)
Seg#6: 7851.1 m3 (6)
Seg#7: 6981 m3 (7)
8.2.2 IMO class (Oil/Chemical Ship Type 1, 2 or 3): IMO 3
8.3 Number of slop tanks and total cubic capacity (98%): 1,221.40 m3
8.3.1 Specify segregations which slops tanks belong to and their capacity with double valve:
8.3.2 Residual/Retention oil tank(s) capacity (98%), if applicable: 217 m3
SBT Vessels
8.3.3 What is total SBT capacity and percentage of SDWT vessel can maintain? 22,494.60 m3 49.76 %
8.3.4 Does vessel meet the requirements of MARPOL Annex I Reg 18.2: Yes
Cargo Handling and Pumping Systems
8.4 How many grades/products can vessel load/discharge with double valve segregation: 7
8.4.1 State type of cargo containment (integral, independent, gravity or pressure tanks):
8.5 Are there any cargo tank filling restrictions?
If yes, specify number of slack tanks, max s.g., ullage restrictions etc.:
Yes
SG 1.53 up to max 67% of the tank height. SG(between 1.025 and 1.53) shall be in accordance with the following formula. : Max. filling(%) = (1.025/(S.G of load) * 100
8.6 Max loading rate for homogenous cargo With VECS Without VECS
Loaded per manifold connection: m3/hr 1,200 m3/hr
Loaded simultaneously through all manifolds: m3/hr 4,500.00 m3/hr
Cargo Control Room
8.7 Is ship fitted with a Cargo Control Room (CCR): Yes
8.8 Can tank innage / ullage be read from the CCR: Yes
Gauging and Sampling
8.9 Is gauging system certified and calibrated? If no, specify which ones are not calibrated: Yes,
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed)?
What type of fixed closed tank gauging system is fitted: SAAB Radar + Marflex
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves?: Yes,
Are overfill (high) alarms fitted? If Yes, indicate whether to all tanks or partial: Yes, Yes
8.9.1 Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? Yes
8.9.2 Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: ,
8.10 Number of portable gauging units (example- MMC) on board: 4
Vapor Emission Control System (VECS)
8.11 Is a Vapour Emission Control System (VECS) fitted? Yes
8.12 Number/size of VECS manifolds (per side): 1 350 mm
8.13 Number / size / type of VECS reducers:
Venting
8.14 State what type of venting system is fitted: Individual High Velocity P/V Valves & Mast Riser
Cargo Manifolds and Reducers
8.15 Total number / size of cargo manifold connections on each side: 8 / 400.00 mm
8.15.1 Does the vessel have a Common Line Manifold connection? If yes, describe:
8.16 What type of valves are fitted at manifold: Other
8.17 What is the material/rating of the manifold: Stainless Steel /
8.17.1 Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? Yes
8.18 Distance between cargo manifold centers: 2,000.00 mm
8.19 Distance ships rail to manifold: 4,441.00 mm
8.20 Distance manifold to ships side: 4,600.00 mm
8.21 Top of rail to center of manifold: 700.00 mm
8.22 Distance main deck to center of manifold: 2,100.00 mm
8.23 Spill tank grating to center of manifold: 900.00 mm
8.24 Manifold height above the waterline in normal ballast / at SDWT condition: 13.10 m 8.10 m
8.25 Number / size / type of reducers: None
8.26 Is vessel fitted with a stern manifold? If yes, state size: No, 0.00 mm
Heating
8.27 Cargo / slop tanks fitted with a cargo heating system? Type Coiled Material
Cargo Tanks Steam coils SS
Slop Tanks:
8.27.1 Is a Thermal Oil Heating system fitted? If yes, identify tanks?: ,
8.28 Maximum temperature cargo can be loaded / maintained: 66.0 °C / 150.8 °F 66 °C / 150.8 °F
8.28.1 Minimum temperature cargo can be loaded / maintained:
Inert Gas and Crude Oil Washing
8.29 Is an Inert Gas System (IGS) fitted / operational? Yes /
8.29.1 Is a Crude Oil Washing (COW) installation fitted / operational? Yes /
8.30 Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: IG Generator
8.30.1 If nitrogen generator, specify the applicable flow rate for each of the designed purity modes:
Cargo Pumps
8.31 How many cargo pumps can be run simultaneously at full capacity: 14
8.32 Pumps: No. Type Capacity At What Head (sg=1.0)
Cargo Pumps: 14 Centrifugal 600 M3/HR
Cargo Eductors: m3/hr m
Stripping: Marflex MDPC-250 & MDPD-150 cargo pumps m3/hr m
8.33 Is at least one emergency portable cargo pump provided? Yes
Tank Cleaning Systems
8.34 Is tank cleaning equipment fixed in cargo tanks? Yes
8.35 Is portable tank cleaning equipment provided? Yes
8.36 Tank washing pump capacity: 120.00 m3/hr
8.37 Is a washing water heater fitted? If yes is it operational and state max washing water temperature: Yes,
80.00 °C
8.38 What is the maximum number of machines that can be operated at their designed max pressure? 4
Other Deck Equipment
8.39 Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? Yes,
8.40 Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? Yes,
8.41 Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: Yes, , 10,000.00 m3/hr
8.42 Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: , ,
8.43 Is steam available on deck? Yes
 
9. MOORING
9.1 Wires (on drums) No. Diameter Material Length Breaking Strength
Forecastle: mm m MT
Main deck fwd: mm m MT
Main deck aft: mm m MT
Poop deck: mm m MT
9.2 Wire tails No. Diameter Material Length Breaking Strength
Forecastle: 4 60.00 mm PP/PES 11.00 m 91.30 MT
Main deck fwd: 3 60.00 mm PP/PES 11.00 m 91.30 MT
Main deck aft: 3 60.00 mm PP/PES 11.00 m 91.30 MT
Poop deck: 4 60.00 mm PP/PES 11.00 m 91.30 MT
9.3 Ropes (on drums) No. Diameter Material Length Breaking Strength
Forecastle: 4 30.00 mm SuperMax Rope – Dyneema SK 78 (Jacketed) 250 m 68.00 MT
Main deck fwd: 3 30.00 mm SuperMax Rope – Dyneema SK 78 (Jacketed) 250 m 68.00 MT
Main deck aft: 3 30.00 mm SuperMax Rope – Dyneema SK 78 (Jacketed) 250 m 68.00 MT
Poop deck: 4 30.00 mm SuperMax Rope – Dyneema SK 78 (Jacketed) 250 m 68.00 MT
9.4 Other lines No. Diameter Material Length Breaking Strength
Forecastle: 2 40.00 mm POLYPROPYLENE/POLYESTER COMPOSITE 200.00 m 22.20 MT
Main deck fwd: 3 72.00 mm POLYPROPYLENE/POLYESTER COMPOSITE 220.00 m 64.00 MT
Main deck aft: 3 72.00 mm POLYPROPYLENE/POLYESTER COMPOSITE 220.00 m 64.00 MT
Poop deck: 2 40.00 mm POLYPROPYLENE/POLYESTER COMPOSITE 200.00 m 22.20 MT
9.5 Winches No. No. Drums Motive Power Brake Capacity Type of Brake
Forecastle: 2 Double Drum Hydraulic 54.40 MT Screw Type
Main deck fwd: 1 Tripple Drum Hydraulic 54.40 MT Screw Type
Main deck aft: 1 Tripple Drum Hydraulic 54.40 MT Screw Type
Poop deck: 2 Double Drum Hydraulic 54.40 MT Screw Type
9.6 Bitts, closed chocks/fairleads No. Bitts SWL Bitts No. Closed Chocks SWL Closed Chocks
Forecastle: 4 68 MT MT
Main deck fwd: 12 68 MT MT
Main deck aft: 6 68 MT MT
Poop deck: 12 68 MT MT
Anchors/Emergency Towing System
9.7 Number of shackles on port / starboard cable: 12 / 12
9.8 Type / SWL of Emergency Towing system forward: Chafing Chain 204 MT
9.9 Type / SWL of Emergency Towing system aft: Towing Wire 102 MT
9.10.1 What is size of closed chock and/or fairleads of enclosed type on stern: 600mm x 450mm
Escort Tug
9.10.2 What is SWL of closed chock and/or fairleads of enclosed type on stern: 200.00 MT
9.11 What is SWL of bollard on poop deck suitable for escort tug: 200.00 MT
Lifting Equipment/Gangway
9.12 Derrick / Crane description (Number, SWL and location): Cranes: 1 x 10.00 Tonnes
Center
9.13 Accommodation ladder direction:
Does vessel have a portable gangway? If yes, state length: m
Single Point Mooring (SPM) Equipment
9.14 Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? Yes
9.15 If fitted, how many chain stoppers: 1
9.16 State type / SWL of chain stopper(s): Tongue type 204.00 MT
9.17 What is the maximum size chain diameter the bow stopper(s) can handle: 76.00 mm
9.18 Distance between the bow fairlead and chain stopper/bracket: 3.50 m
9.19 Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: Yes
N/A
 
10. PROPULSION
10.1 Speed Maximum Economical
Ballast speed: Kts (WSNP) Kts (WSNP)
Laden speed: Kts (WSNP) Kts (WSNP)
10.2 What type of fuel is used for main propulsion / generating plant: Other (specify) VLSFO/ LSMGO
10.3 Type / Capacity of bunker tanks: Fuel Oil: 0 m3
Diesel Oil: 0 m3
Gas Oil: 0 m3
10.4 Is vessel fitted with fixed or controllable pitch propeller(s): Fixed
10.5 Engines No Capacity Make/Type
Main engine: Kw
Aux engine: 3 Kw
Power packs: m3/hr
Boilers: 2 20.00 MT/Hr
Bow/Stern Thruster
10.6 What is brake horse power of bow thruster (if fitted): No, bhp
10.7 What is brake horse power of stern thruster (if fitted): No, bhp
Emissions
10.8 Main engine IMO NOx emission standard:
10.9 Energy Efficiency Design Index (EEDI) rating number: 5.07
 
11. SHIP TO SHIP TRANSFER
11.1 Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? Yes
11.2 What is maximum outreach of cranes / derricks outboard of the ship's side: 8.90 m
11.3 Date/place of last STS operation:
 
12. RECENT OPERATIONAL HISTORY
12.1 Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last):
12.2 Has vessel been involved in a pollution, grounding, serious casualty or collision incident during the past 12 months? If yes, full description: Pollution: No, Not Applicable
Grounding: No, Not Applicable
Casualty: No, Not Applicable
Repair: No, N/A
Collision: No, Not Applicable
12.3 Date and place of last Port State Control inspection: Dec 20, 2015 / Chittagong
12.4 Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: N/A
Not Applicable
12.5 Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:

*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis.
Contact owner for details.
12.6 Date / place of last SIRE inspection: Mar 29, 2023 / Gavle, Sweden
12.6.1 Date / place of last CDI inspection:
12.7 Additional information relating to features of the ship or operational characteristics: N/a
Revised 2018 (INTERTANKO / Q88.com)